Triskele strikes gold at Chelsea

Korean Herb Drying Tower
RHS Chelsea Flower Show, London
Let’s face it, pretty much every garden at Chelsea is a mountain of achievement. Snowdrops that flower in May, mature trees springing up overnight and every plant in the peak of condition. More extraordinary still, it’s all gone in a fortnight.
Not a place that you’d expect to find the team from Triskele, who rarely find themselves working on anything that’s not been standing for at least a hundred years. But this year, for Jihae Hwang’s garden, A Letter from a Million Years Past, we made an exception. At the heart of this medicinal mountain garden is a 5m-tall herb-drying tower, constructed using the traditional techniques of Korea’s mountainous Jirisan region, from rock, timber and earth. With thousands of visitors passing through the garden, it was important to make sure this rapidly erected structure would cope. Before construction began, we were asked to carry out the structural assessment and engineering of the tower, providing the necessary structural sign-off while respecting its traditional materials and methods of construction.
The chance to play in the mud and get hands-on involvement in such an ancient building technique was too tempting to resist. Conor soon found himself up to his elbows in mud as he turned from structural engineer into mud and wattler.
The pressure was perhaps greater than first anticipated. During his visit to the garden, King Charles III joined Jihae Hwang inside the tower – providing a rather high-profile test of our calculations and hard labour. Happily, both King and tower remained standing.
Not a place that you’d expect to find the team from Triskele, who rarely find themselves working on anything that’s not been standing for at least a hundred years. But this year, for Jihae Hwang’s garden, A Letter from a Million Years Past, we made an exception. At the heart of this medicinal mountain garden is a 5m-tall herb-drying tower, constructed using the traditional techniques of Korea’s mountainous Jirisan region, from rock, timber and earth. With thousands of visitors passing through the garden, it was important to make sure this rapidly erected structure would cope. Before construction began, we were asked to carry out the structural assessment and engineering of the tower, providing the necessary structural sign-off while respecting its traditional materials and methods of construction.
The chance to play in the mud and get hands-on involvement in such an ancient building technique was too tempting to resist. Conor soon found himself up to his elbows in mud as he turned from structural engineer into mud and wattler.
The pressure was perhaps greater than first anticipated. During his visit to the garden, King Charles III joined Jihae Hwang inside the tower – providing a rather high-profile test of our calculations and hard labour. Happily, both King and tower remained standing.
Scope of work
Structural assessment and engineering; structural design and sign-off; assessment for public access; traditional timber-frame construction; traditional timber jointing and pegged connections; wattle and earth construction; on-site construction and assembly; collaboration with specialist earth-builder Alex Gibbons of Stick in the Mud
Materials used
Structural timber; traditional timber pegs and jointed connections; wattle and daub; earth, lime and clay; straw; sand; natural stone
Client type
Cultural Exhibition
Duration
One month